Here's where we keep the master list of all the things we need to get done. Fun!
Contents
Pre-Play To-Do
Hedgefund
(committee: Wade, Sunny, Heather, Sara) N/A
-
Yard Sale - Jun 13 & 14 at Carl and Heather's Budget: Sunny will acquire budgetary responsibilities
Transportation
(committee/org: Diana)
-
Chris reserving truck -
get insurance cert to Avon (Carl) -
determine return departure days(All) -
car shuffle/org - Get airport arrival times
- Ossi (in LA)
- Whitney (sac drop-off)
- Caleb (Whitney p/u in Sac)
-
Sacramento Hotel Reserved(Wade)
Playa To-Do
(committee: Meghan, Diana)
General Camp/Signage
- create whore chart (diana)
- including descriptions of chores
- create camp guidelines sign (Jeff)
-
Dr Carl signage(Jeff) -
assemble/revamp Tiki Bar(Jeff)have the new roof! (thanks to Sunny and Wade)revamp the mystical myst-ation system
-
Audio Sciences(Jeff, Wade) -
Buy Megaphone (or two)Return Meghan's megaphone and use money elsewhere
Board/Tiles
(Board committee: Carl + ? / Tile Committee: Shannon, Brigid)
- Board
-
Board: Subcommittee on Board Construction and Reinforcement will provide shopping list for reinforcement (Carl) -
List for what else needs to happen for board rebuild goes here (Caleb) - create additional board items
-
- Tiles
-
Big Stamp: Barney will attempt to handcraft our big stamp -
Prime -
Re-paint -
Stamp -
Tile list: create list of old tiles for possible use to be voted on (Shannon) -
Write items -
create back-up tiles - new tiles need to be stamped, shellacked and left blank
-
all tiles need a good screwin (to re-expose the hole for easier application on playa) -
need a "nut and bolt" count to be sure we have enough to attache all the tiles.
-
For next meeting:
Jeff and Meghan to bring stamp and padVaughn please bring a can of the spray shellack coatI will transport the tiles so we can all "screw" in our downtime =)- then tiles will be ready and playa bound!
Prizes
(committee: Wade, Diana, NOT Sunny)
-
Save bottle caps and corks so we can possibly transform them into beautiful necklacesn/a -
design magnets - due by July 3rd -
vote on magnet design - July 7th -
order magnets -
assemble magnets -
order button maker(Brigid) - print art (Shannon)
- cut art (All)
- assemble buttons (All)
- buy string/chain (FYI - Sunny's got 500ft of string. it's not the prettiest... but these are ultimately buttons anyway, right? can use if we don't find anything better.
- string buttons (All)
Dome
-
Buy more hardware - Need tent stakes for carport(s) - last year we used spares that we luckily had.
Porch
- Lighting: Subcommittee on Electricity and other Technological Magic will discuss further lighting and power
- LED rope lights are still not showing up on sale anywhere. Likely the board will go dark again this year.
Quonset Hut
(committee: Josh, Caleb, Carl, Vaughn)
- Shelter
- Second Test Build, 1/2 of the hut, the
15th or 16th22nd or 23rd of August? - separate out old tarps that will be used for first tarp layer
- 8/17/09 - initial PVC order arrived!!!! YAY!! second batch en route, but at least we have most of it. will pick up SATURDAY 8/22 BEFORE MEETING - 930amish?
Grey Water / Aquatic Sciences
(committee: Vaughn, Shannon, Wade, Jeff)
-
Grey Water: Subcommittee on Water Evaporation and Aquatic Sciences will develop a superior grey water system (Vaughn, Shannon) -
All parts acquired -
Tray, mast and drum are constructed - Wind prop is built but needs refining
- Pulley and prop need to be attached and tested
- Drum needs final lining on it
Again, if anyone wants to marvel at the plans, they're online at Instructables http://www.instructables.com/id/Gray_B_Gon_wind_powered_evapotron_for_graywater_di/
NOTE: we will most likely need to build this 8/15 or not during a meeting.
On-playa transportation
(committee: Carl, Diana)
-
design Playa Surrey (D, C, V) - done, mostly - make Playa Surrey - in progress
-
determine # of single bikes to be brought to playa(5) -
Bits were boughten. Knowledge was obtained from an elder bike wizard at the Bike Oven. - Found cheap leaf springs on teh interweb. $20.99
- Bikes will be welded this coming weekend (Aug 2), steering mechanism will be installed. Trailer construction will begin.
- Welding in process
Dr. Carl's - By Appointment
(committee: Sunny, Whitney, Brigid)
- "Sangria n S'mores"
-
Determine date for mixerTuesday CONFIRMED! -
make pre-playa invite (Whitney and Derek to create and email--for Coffee Zombies, Trashi's, and whoever else we know we like beforehand) -
make on playa invites - bracelets (brigid) - MENU:
- White Sangria (Whitney to bring)
- Red Sangria
- S'mores (Whitney to bring)
- Frozen fruit (Sunny/Costco card member)
- need to bring propane camp stove and s'mores extensions (wade & sunny)
Food & Drink
(committee: Caleb, Jeff)
-
create menu - extra, large cooler (Whitney to bring)
- how many vegetarians? - Just Oss
-
create shopping list based on menu - SHOP
Menu
- Sunday - Cold cuts/ cheese/ veggie sandwiches/ PB & J w/ chips
- Monday - Burgers/ dogs/ Morningstar burgers w/ corn
- Tuesday - Grilled cheese w/ tomato soup
- Wednesday - Grilled pork tenderloin/ grilled chicken/tofu w/ rice
- Thursday - Ground turkey sloppy joes in pita (tofu for the veggies) w/ chips
- Friday - Quesadilla w/ beans/ salsa
- Saturday - Grilled cheese w tomato soup
- Sunday - Canned chili w/ Fritos
Shopping List
(committee: Sunny, Brigid, Diana)
- Google Docs shopping checklist: 2009 SHOPPING CHECKLIST
Misc
Home Depot shopping list